Trusted since 2001  ·  Same-day response for emergencies ·  Call 951-458-6466

Post-Construction Cleaning Services

Rough clean, final clean, and touch-up detail for builders, contractors, and homeowners on a deadline.

The build is finished, and now every surface is coated in drywall dust. Mr. Local Services has handled post-construction cleaning since 2001, and we know that one quick pass never holds. Our crews use HEPA extraction, phase-specific checklists, and finish-safe products so the space is genuinely move-in ready.

    Get a Free Quote

    Tell us what you need a real person calls you back, usually same day.

    No obligation · Upfront pricing · We never share your info

    25 Years

    In Business

    5-Star

    Rated

    Licensed

    Contractors

    $2M

    Liability Coverage

    100%

    Satisfaction Guaranteed

    Tiny home on wheels with wood siding and metal roof

    Who They're For and What They Solve

    Is Post-Construction Cleaning and When Do You Need It?

    Post-construction cleaning is the specialized cleanup performed after building, remodeling, or renovation work ends. It goes far beyond normal cleaning. We remove construction debris, extract fine drywall dust from every surface and cavity, strip adhesive residue and paint splatter, and detail fixtures, glass, and flooring until the space is ready for occupancy.

    Builders, general contractors, remodelers, homeowners, and property managers all need this service. The trigger is always the same moment: final trades pull out, the punch list is nearly closed, and the space is technically complete but completely unusable. Handover dates, buyer walkthroughs, and final inspections cannot happen until the dust is gone.

    The core problem is fine particulate. Drywall dust stays airborne for days and resettles onto surfaces that already looked clean. Skip proper extraction and you get streaked glass, gritty floors, clogged HVAC filters, and a failed walkthrough. Left unaddressed, that dust migrates into ductwork, damages new finishes, and delays your closing date.

    Our Services

    What Our Post-Construction Cleaning Covers

    Post-construction cleaning runs in phases, and we handle every one of them.

    Rough Clean (Phase One)

    The first pass, performed after framing, drywall, and mechanical work. We haul out debris, sweep and vacuum bulk dust, clear scrap and packaging, and remove trash from every room. The result is a safe, workable site for the finishing trades.

    Final Clean (Phase Two)

    The detail phase after all trades finish. We wipe every surface, clean inside cabinets and drawers, detail fixtures and hardware, scrub bathrooms and kitchens, polish glass, remove labels and residue, and finish floors. This is the phase that produces a move-in-ready space.

    Touch-Up Clean (Phase Three)

    Performed right before handover, walkthrough, or closing. Punch-list repairs always generate new dust and fingerprints. We re-clean affected areas, re-polish glass, and re-detail high-visibility surfaces so the space presents perfectly on the day it matters.

    Fine Dust Removal and HEPA Air Filtration

    The technical work most crews skip. We vacuum vents, ledges, ceiling fans, door tops, and duct openings with HEPA equipment, then filter the air to capture suspended particulate before it resettles. This is what stops the callback.

    Not sure which approach your situation needs? We assess first and recommend only what’s necessary, no upsells.

    Why Homeowners Choose Mr. Local Services

    Why Customers Choose Mr. Local Services for Post-Construction Cleaning

    Post-Construction Specialists Since 2001

    This is not general housekeeping with a different name. Our crews train specifically on construction cleanup, HEPA equipment operation, and finish-safe product selection for uncured paint and new grout.

    Written 48-Hour Re-Clean Guarantee

    Flag anything on your walkthrough and we return within 48 hours to correct it at no charge. The guarantee is written into every completed job, not implied.

    Documented Checklist and Signoff Sheet

    Every phase runs off a printed checklist. You receive a completed signoff sheet before our crew leaves, so nothing is disputed later.

    $2M Insured, Bonded, Independently Owned

    We carry $2 million in general liability plus workers' compensation on every crew member. Your finishes, your project, and your liability exposure are all covered.

    How It Works

    Our Post-Construction Cleaning Process

    1

    Call and Walkthrough

    Call 951-458-6466 and we schedule a site walkthrough within 24 hours to measure scope, phase, and finish sensitivity.

    2

    Written Itemized Quote

    You receive a written quote listing each phase, included tasks, crew size, and total price. No change orders without your written approval.

    3

    Phased Crew Execution

    Our crew arrives with HEPA equipment and phase checklists, works room by room, and confirms daily progress with your site contact.

    4

    Walkthrough and Signoff

    We walk the finished space with you, correct anything flagged on the spot, and hand over the completed signoff sheet.

    Pricing

    What Does Post-Construction Cleaning Cost?

    We publish real numbers because guessing helps nobody. Most post-construction cleaning falls between $0.25 and $0.55 per square foot, which puts a typical 2,000 square foot final clean at roughly $500 to $1,100. Single-room remodels usually run $250 to $600.

    Four factors drive the price: total square footage, which phase you need, debris volume left onsite, and finish sensitivity. Uncured paint, unsealed stone, and delicate hardware require slower methods and cost slightly more.

    Every quote is written and itemized before we begin. Call 951-458-6466 for a firm number after a free walkthrough.

    Frequently Asked Questions About Post-Construction Cleaning

    Most jobs run $0.25 to $0.55 per square foot, or $500 to $1,100 for a 2,000 square foot final clean. Quotes are written and itemized.

    Rough clean removes debris and bulk dust mid-build so trades can work safely. Final clean is the detailed pass that makes the space move-in ready.

    A single-room remodel typically takes four to six hours. A full 2,000 square foot final clean usually takes one full day with a three-person crew.

    Yes. We bring HEPA vacuums, air filtration units, ladders, and finish-safe products. You provide nothing except site access and water.

    We carry $2 million in general liability and workers' compensation on every crew member. Certificates are available before work begins.

    Not necessarily. When there is no construction dust involved, our deep cleaning service covers finished homes at a lower cost and a different scope.

    Call 951-458-6466 and we schedule a free walkthrough within 24 hours. Most projects are booked within 48 hours of the quote.

    Ready to Hand Over a Spotless Space?

    Your deadline is fixed, and dust is the only thing standing between you and signoff. Book a free walkthrough today and we will have a written quote in your hands within 24 hours.

    Or fill out our quick online form to request a free quote. We respond fast.

      Get a Free Quote

      Tell us what you need a real person calls you back, usually same day.

      No obligation · Upfront pricing · We never share your info